Project Profile
Highways and Bridges
Project:
Reconstruction along the Long Island Expressway I-495 including interchanges with the Oyster Bay Expressway Route 135 & the Northern State Parkway
Value:
$102,000,000.00
Client:
State of New York
Department of Transportation
Work consisted of expanding the existing three-lane highway to a four-lane highway to accommodate a high occupancy vehicle lane. The separating grass median was removed, the existing adjacent storm drainage system was abandoned and removed, and a new central storm drainage system was installed.
Various existing bridges had to be replaced to accommodate the roadway change. In addition , two new precast concrete bridges were built. Most of the work was performed during evening hours.
All work was completed ahead of schedule. < Back